This bridge project for the Yavapai Prescott Tribe Connector Road spans Granite Creek just off Hwy 89. The bridge design consists of two concrete abutments with one pier cap that is supported by five columns that are 5’ in diameter, twenty-two precast girders, with an 8” thick concrete span between the abutments