List of Recently Finished Projects

(Organized by most recently completed on top)

Burnt Well - Phoenix Hwy (I-10) Burnt Well Rest Area
For Whom: ADOT
When Completed: November 2014
What Was Done:Restroom Renovations, Vending Building and Ramada Renovations, Pavement Marking, Signage, Water and Wastewater Systems.

(Sub to Fann Environmental) Prescott Airport WRF Expansion Phase 1
For Whom: City of Prescott
When Completed: October 2014
What Was Done: Site Preparation, Demolition, Excavation, Earthwork, Rip Rap, Paving, Curb & Gutter, Sidewalk.

Paving Roads and Parking Lots
For Whom: Grand Canyon Resort Corporation
When Completed: October 2014
What Was Done: Paving Parking Lots and Various Roads near Grand Canyon West Airport.

Diamond Bar Road - Phase 2
For Whom: Hualapai Nation / Bureau of Indian Affairs (BIA)
When Completed: October 2014
What Was Done: Grading, Drainage, Paving, Striping.

Cameron-Bitter Springs Hwy (US 89) Moenkopi Wash-Hidden Springs
For Whom: ADOT
When Completed: September 2014
What Was Done: Milling, Placing AC, AC Friction Course, Guardrail and End Terminals Pavement Marking and other Misccellaneous Work.

Kayenta Health Center - Phases 1 & 2
For Whom: Flintco CMAR/Indian Health Services
Scheduled Completion Date: August 2014
What's Being Done: Subgrade, ABC, AC Paving & Striping, Mass-Ex, Lime Stabilization, Water, Sewer, Storm Drain.

Ortiz Street Rehabilitation Project
For Whom: Town of Prescott Valley
When Completed: August 2014
What Was Done: Sawcutting, Remove Asphalt, Curbs, Sidewalks, Driveway Entrance, Sewer Pipe Rehabilitation and Roadway Reconstruction.

Cordes Junction - Flagstaff Hwy I-17 Coldwater Canyon Rd - Crown King Rd
For Whom: ADOT
When Completed: August 2014
What Was Done: Milling, Paving, Fog Coating, Slope Improvement, Striping.

Tuba City - Four Corners Hwy (US 160) Jct SR 564 - Tsegi
For Whom: ADOT
When Completed: July 2014
What Was Done: Constructing a Passing Lane, Milling, Paving, Overlay, Extending Pipe Culverts, Striping, Seeding, Rumble Strip.

Mesa - Payson Hwy (SR 87) Junction SR 188 to Rye
For Whom: ADOT
When Completed: May 2014
What Was Done: Milling, Guardrail, Shoulder Widening, Paving, Signage, Pavement Marking.

Goldwater Lake Park Day Use Expansion Project
For Whom: City of Prescott - Parks & Recreation
When Completed: Completed December 2013
What Was Done: Install New Well, Water Systems, Roadway, Parking, Utilities, Group Pavilions, Restroom, Playground

Cordes Junction-Flagstaff Hwy, I-17 Sedona TI-Stoneman Lake TI
For Whom: ADOT
When Completed: Completed November 2013
What Was Done: Milling, AC, ACFC, Guardrail, Striping

Springerville Municipal Airport - Runway Rehabilitation 3-21, Phase V
For Whom: Town of Springerville
When Completed: Completed October 2013
What Was Done: Milling, Asphalt, Asphalt Mesh, Borrow, Grading, Striping, Crack/Joint Sealing Airport Runway.

Black Mesa - Tuba City Four Corners Hwy (US 160) County Line
For Whom: ADOT
When Completed: Completed October 2013
What Was Done: Milling, AC Paving, AR-ACFC Paving, Guardrail, Cattle Guards, Striping

Statewide, McGuireville & Hassayampa Rest Areas
For Whom: ADOT
When Completed: Completed October 2013
What Was Done: Drill & Equip Water Well System, Utility Lines, Install New Tank, Repair Waterlines, Realign Exist Sewerline, Microsurfacing

Kingman - Ash Fork Highway (I-40) Weigh Station to Ash Fork (WB)
For Whom: ADOT
When Completed: Completed September 2013
What Was Done: Milling, Paving, Replacing Bridge Barriers, Guardrail, Median Crossovers

12in Sewer Line, Prescott VA Center - SUB to REC Solar, Inc.
For Whom: Department of Veterans Affairs c/o REC Solar, Inc.
When Completed: Completed August 2013
What Was Done: Dig, Lay, and Backfill 12-inch Sewer Line

Yuma - Casa Grande Hwy (I-8) Dateland to Aztec
For Whom: ADOT
When Completed: Completed July 2013
What Was Done: Milling, AC, ARACFC Overlay, Guardrail, Shoulder Buildup, Striping

Benson - Stein Pass Highway (I-10) San Simon - State Line
For Whom: ADOT
When Completed: Completed July 2013
What Was Done: Milling, Paving, Guardrail, Replacing Bridge Deck, Pavement Markings

Phoenix - Cordes Junction Hwy (I-17) Sunset Point Rest Area
For Whom: ADOT
When Completed: Completed July 2013
What Was Done: Drilling and Equipping a Water Well System, Utility Lines, Treating Drinking System, Rehabilitating Existing Ramada Roofs

Yavapai - Prescott Indian Tribe Connector Road / SR 69 Widening Phase 4
For Whom: Yavapai-Prescott Indian Tribe
When Completed: Completed July 2013
What Was Done: Paving, Box Culvert Extension, Pipe Extensions, Curb, Gutter, Guardrail, Signs, Pavement Marking, Seeding, Traffic Signals

Fain Road Widening Project (SR 89A to SR 69 Spur)
For Whom: ADOT
When Completed: Completed July 2013
What Was Done: Grading, Paving, Pipe Culverts, Extending Box Culverts & Pipe Culverts, Four New Bridges, Lighting, Guardrail, Seeding

City of Prescott Zone 12 Reservoir Project
For Whom: City of Prescott
When Completed: Completed June 2013
What Was Done: 3.25 Million Gallon Welded Steel Tank, 18-in DIP Transmission Water Main, 16-in DIP Water Main, Earthwork, Paving, Landscaping, Seeding

Rehabilitation of Bright Angel Trailhead Area, Grand Canyon National Park - SUB to Merrill, Inc.
For Whom: National Park Service
When Completed: Completed May 2013
What Was Done: Demolitions / Removals, Parking Lot, Rim Trails, Boulder Setting, Concrete Preparation, Stone Wall Preparation

Yavapai - Prescott Indian Tribe Former Southwest Forest Products Site Fill/Site Prep
For Whom: Yavapai-Prescott Indian Tribe
When Completed: Completed May 2013
What Was Done: Prepare, Place, Compact Import Material

Grand Canyon West Airport Phase 5
For Whom: Hualapi Nation
When Completed: Completed February 2013
What Was Done: Pave Runway, Taxiways, Parking Apron, Complete Grading & ABC, Warm Up Pads, Expand Parking Apron, Landing Pads, Electrical Signage, Fencing, Pavement Marking

Cliff Rose Lift Station - SUB to Fann Environmental, LLC
For Whom: City of Prescot c/o Fann Environmental, LLC
When Completed: Completed January 2013
What Was Done: 6in HDPE Force Main Installation

Leupp Field Clinic Parking Lot Paving - SUB to Keyah Construction, Inc.
For Whom: Winslow Indian Health Care Center, Inc.
When Completed: Completed December 2012
What Was Done: Pulverize, Re-Grade, and Place 2in MAG AC

Flagstaff - Clint's Well Road (Lake Mary Road)
For Whom: Federal Highway Administration
When Completed: Completed December 2012
What Was Done: Pulverizing, Roadway Excavation, Paving, Guardrail, Seeding, Signs, and Striping

Tuba City - Four Corners Hwy (US 160) Five Miles West of Tuba City
For Whom: ADOT
When Completed: Completed December 2012
What Was Done: Roadway Widening, Install Pipe Liners Inside Existing CMP @ 12 Locations

Quartzsite - Parker - Topock Hwy (SR 95) Bill Williams National Wildlife Refuge Road
For Whom: ADOT
When Completed: Completed December 2012
What Was Done: Construct Turn Lanes, Drainage, Striping, Signage, Guardrail, Retaining Walls

Williamson Valley Road Mill and Fill Project Pioneer Parkway to Outer Loop Road
For Whom: Yavapai County
When Completed: Completed November 2012
What Was Done: Milling, AC, Shoulder Build-up, Pavement Markings

Mt. Vernon / Senator Highway Improvements
For Whom: City of Prescott
When Completed: Completed November 2012
What Was Done: Replace Existing Water & Sewer System, Roadway, Curb, Gutter, Sidewalks, Drainage, Guardrails, Retaining Walls, Utility Upgrades, Paving

Williams - Grand Canyon - Cameron Highway (SR 64, Tusayan)
For Whom: ADOT
When Completed: Completed November 2012
What Was Done: Widening of Roadway, Roundabout Intersections, AC & ACFC, Pipe Culverts, Riprap, Pavement Marking, Signing, Lighting

Flagstaff - Holbrook Highway (I-40) Coconino National Forest Boundary - Buffalo Range
For Whom: ADOT
When Completed: Completed November 2012
What Was Done: Milling, AC & ACFC, Shoulder Build-Up, Pavement Markings, Loop Detector, Guard Rail, Rumble Strip

Winslow - Kayenta Highway SR 87; MP 368.0 to MP 385.0, North of I-40
For Whom: ADOT
When Completed: Completed October 2012
What Was Done: Overlay Existing Pavement w/ ACFC (Special, PG 70-22 TR+), Pavement Markings

Mesa - Payson (SR87 Sunflower Near Maricopa/Gila County Line)
For Whom: ADOT
When Completed: Completed October 2012
What Was Done: Milling, Paving, Drains, Inclinometers / Piezometers, Pavement Markings

Holbrook - Keams Canyon Hwy (SR 77) Jct I-40 to Navajo Nation Boundry
For Whom: ADOT
When Completed: Completed October 2012
What Was Done: Cold Recycle AC, AC Overlay, Dbl Application Seal Coat, Replace Cattle Guards, Guardrail, Pavement Markings

Mesa - Payson Hwy (SR 87) Mt Ord to Slate Creek
For Whom: ADOT
When Completed: Completed September 2012
What Was Done: Remove Soil Nail Retaining Walls, Excavate & Grade Slope, Repair & Construct Embankment, Slope Scaling

Old North Reservoir Replacement Project
For Whom: City of Prescott
When Completed: Completed September 2012
What Was Done: Construct 3.0 MG Concrete Reservoir, Demolish Old Tank, Site Grading, Water Main Installation, Roadway Improvements, Electrical Controls