|
|
 |

Current Fann Contracting Jobs in AZ
Roll over the FANN logos with your mouse pointer for pop-up information on each project.
-
Fain Road
Widening (SR 89A to SR 69 Spur) - ADOT - Grading, Paving, Pipe Culverts, Extending Concrete Box Culverts and Pipe Culverts, Four New Bridges, Signage, Pavement Marking, Lighting, Guardrail, and Seeding
-
Quartzsite - Parker - Toprock Hwy
SR 95 at Bill Williams River National Wildlife Refuge Rd - ADOT - Adding a Right Turn Lane (NB & SB), a two-way left turn lane, shifting the intersection for the turnouts, new access rd, Drainage Improvements, Pavement Markings, Signage, Guardrail, and Retaining Walls
-
Mesa - Payson Hwy
(SR 87) Mt Ord to Slate Creek - ADOT - Remove Soil Nail Retaining Walls, Excavating & Grading a Slope, Repairing & Constructing embankment, and Slope Scaling. CMPs, Inlets, Underdrains, Concrete Spillway, Erosion Control, and Landscaping
-
Kayenta
Kayenta Health Center (Subcontract to Flintco) - Mass Excavation, Lime Stabilization, Water, Sewer, Storm Drain, ABC, AC
-
US Dept. of Interior
Bureau of Indian Affairs - Navajo Routes 6, 15, 221 - Pavement Rehabilitation and Overlay
-
Centerpointe East Drive Extension
Granite Dells Estates Phase 1B - Curb, Gutter, Sidewalk, Stormdrain, Sewer, Water, Electrical, Gas, Paving, Chipseal, Signing & Pavement Marking.
-
I-40 East of Flagstaff
ADOT Buffalo Range - I-40 Milling, Paving, Guardrail, Pavement Markings, Replacing Loop, Detectors, Traffic Control
-
Grand Canyon - Tusayan
ADOT Tusayan - Grand Canyon - Cameron Highway - Clear & Grub, Remove Concrete, Milling, Excavation, Paving, Markings, Curb & Gutter, Misc. Electrical, Landscaping, Erosion Control
-
I-17 Munds Park
ADOT I-17 Munds Park to Yavapai County Line - Milling, Paving, Remove / Replace Guardrail, Pavement Markings
-
I-17 Stoneman
ADOT I-17 Stoneman to Coconino County Line - Milling, Paving, Markings, Reconstruct Guardrail, Seeding, Rumble Strip
-
Old North Reservoir Replacement Project
Prescott - Construction of a new 3 MG Concrete Reservoir to replace the existing 1.4 MG Tank. Demolition, site grading, water main installation, roadway improvements, electrical.
-
Palo Verde Nuclear Facility
Upgrade Ingress/Egress Road, Parking Lot, Access Facilities
|
|
|
|